Cutting Room Economics for Knit Garment Programs

Short answer: Your fabric invoice is not your fabric cost. Between the roll and the sewing line, knit programs typically lose another 10–18% to marker inefficiency, lay-end waste, splice planning and shrinkage allowance. A program cut at 84% marker efficiency can cost $0.50–0.90 more per garment than the same program cut at 90% — before a single stitch is sewn. If you are not auditing the cutting room, you are pricing garments on fiction.\
\
Where the fabric actually goes\
\
\
The shrinkage allowance mistake\
\
\
Marker efficiency levers worth negotiating\
\
\
Numbers from a real 3,000-piece run\
\
A recent 3,000-piece polo program at 220 GSM consumed 2,400 kg of fabric at $4.80/kg. At 84% marker efficiency the garment fabric cost was $2.63 per piece; the same tech pack re-planned to 89% efficiency landed at $2.48 — $0.15 per garment, $450 on the program, achieved by re-mixing sizes per marker and moving splices onto hem lines. Nothing about the fabric changed. That is the whole argument for caring about the cutting room.\
\
What a cutting audit should check\
\
\
Conclusion\
\
Cutting is the quietest cost centre in knit production and the easiest one to ignore, because nobody quotes it to you. The fix is not distrust; it is visibility. Ask for the marker plan, the efficiency assumption behind your quoted consumption, and the shrinkage allowance figure — three numbers that most quotes never state. Buyers who ask these questions routinely find 3–6% of fabric cost hiding in the answer.\
\
Key Takeaways for Buyers\
\
\
Work with HONGTEX\
\
HONGTEX runs its own cutting room with lay records, marker efficiency reporting and first-cut wash verification as standard on every knit program. Send us your tech pack and we will show you the consumption calculation line by line — quoted within 24 hours, no hidden percentages.
Related Products
Related Articles
- Custom Knitwear Production: A Step-by-Step Guide for Brandsguide · production

- Knitwear Tech Packs: The Sections Factories Actually Readtech-pack · guide

- Sampling: Why Your PP Sample Is the One That Matterssampling · production

- How Long Does Knitwear Manufacturing Take? A Lead Time Guidelead-time · production

- Why Apparel Orders Get Delayed (and How to Prevent It)lead-time · production

- Switching Suppliers: Run Both for One Ordersupplier · sourcing

Comments (0)
Be the first to leave a comment!